on 12-15-2012 6:00 AM
Hello,
I want to understand if the system behaviour is correct. I am allocating my costs based on sales quantity of the material
Say my cost is Rs. 1000
Sale of Product 1= 1 Ton
Sales of Product 2= 1 Ton and 2 Bags
We have set relationship in material master as 20 Bags = 1 Ton
So 2 Bags = .01 Ton
Therefore, Sale of Product 1 = 1 Ton
Product 2 = 1.10 Ton
If I calculate tracing factor of product 1 and product 2 than it comes to ratio 1:10 (1000:1100), which I believe is correct
But If I see in the system, it comes to 1:3 (1000:3000). I do not understand why the system has not considered conversion relation between unit of measures ?
Can any body help on how it can be corrected ?
BR..
Hi,
I assume that in the cycle definition you have record type F as the tracing factor ?
In that case system will check the posted sales quantities of the billing documents.
So you would have sold 1000 Ton of product 1 and 3000 Ton of product 2 in the corresponding period.
So you need to check in KE24 for the sales quantities of the materials.
During allocation system will not do any conversion of sales quantities based on material master. It will do the calculation purely based on the billed sales quantities in COPA i.e. record type F in COPA for the receiver selection criteria.
regards
Waman
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.