Skip to Content
author's profile photo Former Member
Former Member

Integrating with SCM Predefined Content.

Hi,

I have a requirement of integration Using SCM Predefined Content for PI 7.30 dual stack.

What Steps need to perform , in such senarios .. Please guide.

Need to know What to do at ECC Side and PI Side.

All I know is I need to import a predefined content in PI and they(DT, MT , Mapping) are simply ready to use.... am i correct ???

Do I have to perform any steps over ECC Side? - like any importing of content ,activate Proxies , Scheduling reports ..

Please guide. I have not worked on such integration.. So Please Guide me step by step .

Regards

Prabhat Sharma

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 14, 2012 at 05:37 AM

    ....

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi Prabhat,

      As per my understanding custom Reports will generate IDocs and will be sent to PI. In that case you have to complete ALE Configurations at SCM and PI side. As you mentioned you have Dual stack then you can use Standrad Abap based IDoc adapter. Please find the below blog for End to End configuration:

      http://www.riyaz.net/sap/beginners-guide-to-ale-and-idocs-a-step-by-step-approach/18/

      All the required DT, MT, MM and OM will be available in your standard content. After upload the content in your ESR, you just need to create Configuration Objects in Directory and use available objects (Service Interface, Operation Mapping) in Receiver Determination, Interface Determination, Sender Agreement, Receiver Agreement, you dont need to create Sender IDoc adapter, only Receiver Adapter...Thats all.

  • Posted on Dec 13, 2012 at 11:40 AM

    Hi Sharma,

    You have to follow like below:

    1.Fisrt of all, you have to IMPORT your SCM Content into PI ESR and Activate.

    2.Configure your Configuration Scenarion as per the Integration Scenario from the ESR Content.

    3.Complete the prerequisites as per the SCM PI Content Guide given to you along with the PI content.

    4. Fill the Pre-requisites in ECC and/OR in the Backend system and alo in PI in ABAP stack and or ID.

    Then run the scenario and check for the results.

    Regards,

    Sreeni.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.