Skip to Content
author's profile photo Former Member
Former Member

Smart form transport

Hi..

I have modified a smart form and also modified a standard text used in the form. I have kept the smart form and the standard text under a same

TR (D01K907841) and transported the TR from Development server to Quality server. Now again I have modified the smart form and save it in a new TR(D01K907843) and again transported the new TR from development to quality server. My question is which TR I have to transport from quality to production server so that all the changes effect in the production server?

Regards

Dipanjan Majumder

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Dec 13, 2012 at 09:15 AM

    If the standard text is not in the second transport request, you should be required to transport both requests (in correct sequence of course)

    Regards,

    Raymond

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.