Skip to Content

hana studio error

Jan 05, 2017 at 10:21 AM


avatar image


I have a problem can't solve,thanks for your help.

When preview the sales of a certain period of time ,the model can read the data, but preview the sales of upper segment time of a certain period of time,the model reported the following error , the upper segment time is a new date during the filtering, the new date is pushing interval days before the certain period of time

my hana studio version is 2.3.14

Error: [314]: numeric overflow: search table error: [6944] AttributeEngine: overflow in numeric calculation Proposed Solution: please consider using a data type which supports a larger range

10 |10000 characters needed characters left characters exceeded

Hi 婷 刘,

Did you find the solution? I have the same issue.


Ric Mant.

* Please Login or Register to Answer, Follow or Comment.

1 Answer

Kumar Attangudi Perichiappan Oct 28, 2017 at 11:18 PM

Can you check for the following:

1. in Planviz, if any new join is triggered because of the change in selection date.

2. Check if there is large volume of data in one of the table for the selected period as compared to the data range for the default view.

10 |10000 characters needed characters left characters exceeded