cancel
Showing results for 
Search instead for 
Did you mean: 

numeric overflow: search table error: AttributeEngine: overflow in numeric calculation

Former Member
0 Kudos

hi,

I have a problem can't solve,thanks for your help.

When preview the sales of a certain period of time ,the model can read the data, but preview the sales of upper segment time of a certain period of time,the model reported the following error , the upper segment time is a new date during the filtering, the new date is pushing interval days before the certain period of time

my hana studio version is 2.3.14

Error: [314]: numeric overflow: search table error: [6944] AttributeEngine: overflow in numeric calculation Proposed Solution: please consider using a data type which supports a larger range

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi 婷 刘

Please check data type of Calculated attribute / measure you have created; change the data type to accommodate the result; or if its a calculated measure, try type casting the result.

Prasad

Former Member
0 Kudos

hi, Prasad

Thanks for your reply.Maybe I don't have a detailed description.

This model is normal before the HANA version is upgraded from 1.00.091 to 1.00.121,I found this error in the upgraded test.

Once again, the HANA version of 1.00.121 upgrade to 1.00.122, the mode in the Development machine is normal,but error in Production machine.

The following two items are exactly the same.The difference between them is that the sales of daytime.

If the time period of the first project is 20150602 to 20150606, the time of the second project is from 20150529 to 20150602,the time of the second project associated with the first project.

thanks for your help,

婷 刘

Mantovas
Participant
0 Kudos

Hi 婷 刘

Did you find the solution for this problem?

Thanks,

RicMant