Hi All,

Im using ECC 6.0 EhP 6.

I have activated the "Define Cost Settings" check box for a particular Order Type and Plant Code combination, by using the following menu path. But I am still unable to see the costs at operation level in PM Orders. Pls. see images below for reference.

Is there any other settings that is required to achieve the calculation & display of order costs at operation level.

Your inputs would be much appreciated. Thanks.......... J K.

Capture.PNG (4.2 kB)
Capture.PNG (12.3 kB)
Capture.PNG (28.6 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 07, 2012 at 05:57 AM

    Use T code IW37N to see operation level cost.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.