Skip to Content
avatar image
Former Member

Deactivate one operation in inspection plan

Dear Gurus

I have two inspection operation 0010 and 0020 respectively for the same code in the same group counter 01 and


group in inspection plan .Our requirement is deactivate operation 0010 and only operation 0020


should be actived and  MIcs of this operation only has  to be utilized  for result recording.What should be our approach in this regard.Kindly guide me . Is there any method to deactivate

Ramesh


Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Dec 06, 2012 at 05:30 PM

    You probably should copy the inspection plan to a new group counter using the original one as a copy model.  That will copy everything over including all the material assignments.

    Then edit the new plan and delete all mics from the unwanted operation.  Then delete the operation.  This should leave you with just the operation you want.

    Now go back to the first plan mark the inspection plan as blocked. It should no longer be called.  You could also, if you wanted to, delete all the material assignments from the original plan.

    FF

    Add comment
    10|10000 characters needed characters exceeded