Skip to Content
author's profile photo Former Member
Former Member

ox18 assignment removing ( what is the main purpuse)

Dear MM.gurus

i am sd consultant ..i have one strange doubt i know the answer but i want to know the logic why we are doing

suppose while posting stock IN MB1C we face some problems but my doubt is

posting is possible in periads 2006/05 and 2006/04

this is the error but here we have to go MMPV AND HERE we have to maintain physical years and one more alternative method is OX18 HERE we delete assignment company code to plant right

then generally we do remaining settings

BUT MY Doubt is once we removed assignment how we are creating stock

what is main purpose to delete assignment in ox18

bz i am waiting for this answer very very eagerly i hope you understood

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2012 at 05:29 PM

    I mean what i am asking once removed link company code to plant in ox18 instead of of MMPV

    We dont assign once again in ox18 but how we are creating stock from sd point of view

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2012 at 05:31 PM

    Dear Venu

    OX18 HERE we delete assignment company code to plant right then generally we do remaining settings

    I would like to say there is no such practice were we delete in OX18 and then do the remaining things because in OX18 we do the assignment of Plant to the Company code and this is mandatory action needed.

    Please correct the process you are following.

    SAP is beautifully designed that it has MM Period as well as FI Period. But there is restriction in MM that maximum of two months can be open at a time and once the period close can't be open again.

    It works on the basis on previous month and current must posting. MMPV is used to close and open period, you can see it effects in OMSY with your company code.which period is open and which is closed.

    I believe your doubt is clear now.

    Thanking you!

    Ashish Mishra

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 04, 2012 at 05:45 PM

    this error can be addressed by MMPV and MMRV.

    if you are already live with this company code having this issue, please do not touch the OX18 since this is a major configuration that covers org structure assignment.

    also, the posting period is way way so outdated (2006) in your test environment. so you may want to update it.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.