on 11-26-2012 12:57 PM
Hello Everyone,
If any one of you has worked on the configuration of RTI and EYOR for GB in SAP PI 7.3(Dual Stack), I would like to know what the pre-requisite and the configuration for the same as this is a completely new build for me and also I would like to know what are the certificates need to be installed with regards to 7.3. If someone could guide me or provide a SAP standard guide or direct me to some blog/thread which could help me, it would be of a great help. Also would like to know what are the key aspects while configuration which I should keep in mind during the configuration so that i could not go wrong. Many Thanks in advance for the help and support from the gurus.
Regards,
Nitin
Hello Nitin,
Have you searched the forum for any blogs/threads? There is already a lot of information on this topic. Try using the search functionality of failing that use Google.
For example: E-Filing GB Configuration
Regards
Mark
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Mark,
Thanks a ton for your response. I have gone through the link you had provided. Everywhere i always got the solution for PI 7.1 and not for PI 7.3. Correct me if i am wrong, is it the same steps to be followed for 7.3 also? And another small query where can i get the SSL certificates from, is it available in SMP or should I consult the folks who maintain the HMRC.
Regards,
Nitin
Hi Nitin,
Please let me confirm that whether you are configuring the OutGoing Process or Incoming Process.
I did for Outgoing process in PI 7.1, i think it is same as in PI 7.3 also.
Please check these links and keep posting for queries.
e-Filing for Great Britain (PA-PA-GB
http://help.sap.com/erp2005_ehp_04/helpdata/DE/cf/c0934257a5c86ae10000000a155106/frameset.htm
e-Filing GB Middleware: SAP Exchange Infrastructure
http://help.sap.com/erp2005_ehp_04/helpdata/DE/cf/c0934257a5c86ae10000000a155106/frameset.htm
Regards,
Sreeni.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
All the generic steps mentioned in the SAP documents are same in PI 7.3(Dual stack) unless you want to deviate from classical configuration mentioned in SAP guide for e-filling. You just need to download compatible ESR content from SMP. Configuration changes when you go for PI 7.3 Java only. I have recently done a project in 7.3 dual stack involving proxies and certificate and I was able to complete it using the same steps as for PI 7.1.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
83 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.