cancel
Showing results for 
Search instead for 
Did you mean: 

Techinical system missing in LMDB

Former Member
0 Kudos

Hi,

We are trying to add ECC system to LMDB. We are able to see techinical

system in solution manager SLD. But it is not reflecting automatically in

LMDB. We are able to get other techinical systems automatically in LMDB

except this system.

Hence we tried to add ECC system manually in LMDB and tried to sync with SLD.

We are getting following error "Resync of Technical System not possible

due to missing Data Supplier".

Please find the attachment for more details.

Can you please advise us on how to overcome this issue

Regards,

Kirthi S

Accepted Solutions (1)

Accepted Solutions (1)

former_member185239
Active Contributor
0 Kudos

Hi Kirthi,

1. Check the job SAP_LMDB_LDB_000* job whether it is running.

2. In the system preparation phase , In  LMDB setup check whether you are getting any error regarding CR Content or not.

If you are getting the CR Content error then increase the patch to 1.6.32 CIM Model and 8.6 CR_content

3. run the transaction LMDB and then over there you will found Resyn to SLD tab and click on this.

and check  error in SM21 and ST22 transaction if any coming into the system

With Regards

Ashutosh Chaturvedi

Former Member
0 Kudos

Hi Ashutosh,

Many thanks for taking interest to help on the above issue.

Issue got resolved now!!!

Resolution: I have selected other system in the Managed system configuration and did SLD resync.

Now am able to see ECC system in LMDB.

It might be due to some inconsistency although all LMDB relevant jobs are running successfully.

Regards,

Kirthi S

former_member185239
Active Contributor
0 Kudos

Hi kirthi,

Congrats,

That only what i have asked you to do in my third point.

3. run the transaction LMDB and then over there you will found Resyn to SLD tab and click on this.

With Regards

Ashutosh Chaturvedi

Answers (1)

Answers (1)

former_member185239
Active Contributor
0 Kudos

follow the bellow activity :

1. Run the transaction RZ70 and select all and execute it.

2. Run the transaction SMSY_SETUP and execute and a LANDSCAPE FETCH job will run.

Then also if you not get the technical system in the LMDB then check

1. SLD is properly defined in preparation phase.

2. If defined then check the LMDB setup.

With Regards

Ashutosh Cahturvedi

Former Member
0 Kudos

Hi Ashutosh,

Many thanks for your response. Landscapre fetchjob is running successfully on everyday.

SLd and LMDB is setup correctly as we were able to get the details from SLD to LMDB and configured BW ABAP and Portal systems.

We are facing SLD to LMDB sync issue in LMDB for this ECC system.

In RZ 70 tcode of ECC. In host field do we need to mention Fully qualified host or IP address.

We entered IP address of solution manager and able to push the data successfully.

Please advise me.

Regards,

Kirthi S