Skip to Content
0
Former Member
Nov 23, 2012 at 03:54 AM

Planning in PP

28 Views

Hi,

I have two materials of different length say Material A (1000MM) and Material B (500MM). I have a scenario where order comes for Material A separately and Material B separately. I will plan in Work Center 1 for Material A and where only Material A is produced.Similarly I will plan in Work Center 2 for Material B and where only Material B is produced. Now i have third work center 3 where both Material A and Material B can be produced. To save on cost & process time ,work centre 3 is used. After producing 1500 MM Material ,the material is split into 1000 MM(Material A) & 500MM (Material B). How to map this scenario in the system.

Regards,

Pragalathan.S