Skip to Content
0
Former Member
Nov 22, 2012 at 12:32 PM

How to maintain freight cost

750 Views

Hi friends,

I was creating sales order in another SAP system (box) with reference from another SAP system (box), when I checked the conditions of the material to my reference SO there is freight cost that was maintain for that material which is ZFR1 Freight cost.

I tried to maintain this in VK11 and an error is generating " no access sequence maintain for...."

How will I maintain this Freight cost, or extend this to my material, sales org, etc.?

Thanks in advance.