Hello,
While clearing the inspection lot for a material with revision level status, i am receiving the error message
"No inspection plan could be found" and " Sample size could not be calculated" then i created a inspection plan for the material with usage-5 (GR) and status - 4(release) with valid from date- 21.11.2012.
But inspection lot start date and end date is 02.11.2012 and Key date is 18.04.2012 and Posting date of GR is 27.10.2012.
The same error is occuring even if change the inspection start and finish date and key date to creation of inspection plan date
I have areated the material master with the "indicator inspection with task list".
What are the other configuration's to be verified?
Kindly explain what is Key date in inspection specification tab in QA02/QA32 ? and kindly solve the issue
J.Balakrishnan