Skip to Content
0
Nov 20, 2012 at 07:17 AM

Collective PR in Assembly processing

27 Views

In our project three different networks are generated from three materials in Sales Order. In all these 3 network header there are individual network activity with one material assigned to each activity. These 3 materials assigned to different networks are creating 3 different PR.

Our requirement is it should generate only one PR with all the 3 line items. I have checked Network Type parameters and here collective requisition is ticked.

Anybody can suggest?