In our project three different networks are generated from three materials in Sales Order. In all these 3 network header there are individual network activity with one material assigned to each activity. These 3 materials assigned to different networks are creating 3 different PR.
Our requirement is it should generate only one PR with all the 3 line items. I have checked Network Type parameters and here collective requisition is ticked.
Anybody can suggest?