I was trying to upload new bins to a list of materials where i recorded a scenario by chooing MM02-> In selec views i chose WM2-> n filled out the details like Plant, S.Loc,WMNo,Stype.

then WM2 screen came up and ended with bin no upload.

When i tried with list of materials.it threw error. when i checked process in foreground, i observed that, system was selecting the view no 13 from the view selection screen. for some materials its purchasing view and for its accounting view.

How to ensure that for al material system chooses WM2 screen view only .

Regards,

Preeti.PG

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    Posted on Nov 20, 2012 at 09:40 AM

    Material master data should not be loaded with recordings, except you are processing only the basic data screen.

    LSMW offers 3 standard methods to load material master data: Direct input, BAPI and IDOC method.

    if you still insist to use recording method, then you can use the stone old transaction MMZ1, as this has no dynamic screen selection like MM01

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Nov 20, 2012 at 05:43 AM

    Hi Preeti,

    LSMW with recording method will not work when there are any missing entries in any of the views in material master or if you are getting any warning messages while updating.

    So, i would advise to use MM17 transaction or direct input method to upload the bin information.

    Regards

    Vijay

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 20, 2012 at 05:47 AM

    Hi,

    This issue is because different material types have different views activated due to which views sequence changes. Check with OMS2, view's settings for your material types.

    Regards,

    Samir Rana

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      Master Data should be uploaded in system in three ways i.e Direct input, BAPI and IDOC method.

      but if you still want to upload data, you shall upload materail Material type wise, you should check it before that which field are mandatory and which is option, while making recording you have functionality of system to make some field Constant that there is no need to write on excel sheet again and again.

      when you started to make recording, step by step when you reach step No. 5 i.e Maintain Field Mapping and Conversion Rules, than go to EDIT, by clicking it you get the option of Constant, here you just clicks the fields like Materail Veiw, or if materail have same Cost Center you just make it Constat, system pick automatically for materail.

      Hope you got my point.

      Regards

      Mohsin Abbasi

  • author's profile photo Former Member
    Former Member
    Posted on Nov 20, 2012 at 06:34 AM

    Hi,

    Pleas echeck all your material types in OMS2 tcode in that find what are all the views assigned if miss any required viees assign here. and do MM17 or LSMW assign views for marerials

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.