Skip to Content
0
Former Member
Nov 19, 2012 at 07:46 AM

Background scheduling and variant maintenance

98 Views

Hi All,

I got few queries in scheduling a report in background.

1. How to assign a TR to the steps that I have done for scheduling a report in BG from SM36,SM37 tcodes.

2. In one of the steps I have given a variant, but suppose the report is in production, who would assign the variant.I mean if the user wants the data for a different

selection criteria, what should be the approach?

Please help me to understand the above points.

Thanks in advance.

Rgs,

Priya