Hi All,
I got few queries in scheduling a report in background.
1. How to assign a TR to the steps that I have done for scheduling a report in BG from SM36,SM37 tcodes.
2. In one of the steps I have given a variant, but suppose the report is in production, who would assign the variant.I mean if the user wants the data for a different
selection criteria, what should be the approach?
Please help me to understand the above points.
Thanks in advance.
Rgs,
Priya