Hi,

Our requirement is how to capture the down time of the superior equipment,if notification is raised for the equipments assigned to superior.

We have one equipment which is combination of Motor and Pump.I have assigned these two to superior equipment,for example generator.

If I run notification on any of the sub equipment it effects the function of the superior too,so i want to adhere the same down time to superior,when ever i run notification on sub equipment and if I run notification on superior it should be captured at superior only not at sub equipment.

Even I have observed that in this case of superior and sub concept even cost capturing is not happening at superior level only restricted to individual level.

If I maintain superior as functional location I could see cost capturing at Functional location ,but breakdown time not been captured at Functional location,if i maintain down for individual equipments under same functional location.

Regards,