Skip to Content

BO4 - How to change repository relational connecitions in IDT + UDT without import/export unv/unx

Hi,

We have migrated content from qa environment to production environment but the universes in qa point to different schenas to the ones in production.

To this end would like to change the relational connections in the production environment without having to import universe/unx files and change connections and have re-export entire universe.

Is this possible/how to publish these changed co=nnections afterwards.

Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Nov 19, 2012 at 02:40 PM

    Hi,

    Have you tried Connection Over-rides in LCM during the promotion job?


    Regards,

    H

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.