Hi All,
Our concern is, production cost document is not generated after confirmed the operation in Production order.When we checked the cost analysis we couldn't find the product cost document once the operation is confirmed. We have already checked the validity period and also checked the Activity price with the combination of cost center, everything was fine. We couldn't realize that why system not generating product cost document.
Thanks