Skip to Content
0
Former Member
Nov 15, 2012 at 05:15 PM

Heuristic run time

166 Views

Greeting ..

We are running on SCM version 5.1 .. and usually when we run Heuristic (the standard heuristic).. the run time takes too long..(around 3 hours).. does any body know if there is a way that we can improve the run time. "changing some parameters on live cache" , Snotes for improving heuristic run time .. or

if anybody can share with us their run time and how they run heuristic (one job for all loc/product/planner code, or broken down into multiple jobs)

Thanks