on 11-15-2012 10:48 AM
Hi,
We are in SRM4.0, Confirmation status is showing as " Approved ". In BBP_PD we noticed that this confirmation status is in " Error in transmission".
We have checked all the IDocs in SRM and ECC. All the IDocs are posted successfully.
In ECC PO, the material document also created for this confirmation.
Is there any way to process this confirmation.
Thanks,
SU
Hi Suman,
Please check Note #
Note 1488981 - Confirmation remains in 'Error in transmission' status it refer the same issue which you are facing.
Thank you
Ritesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Suman,
Please check the table
BBP_DOCUMENT_TAB, where entries must be struck. Run clean_reqreq_up, entries should be cleared automatically if the idoc post in backend, if you still find the issue then clear the entry for that PO in document tab table mentioned above.
Kind regards,
Krish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.