Skip to Content

contract value

hi

When I want to create the sales order, I would like to enter the material and the relevant quantity. Then system must check the value of the sales order to the value of the contarct. Contract is considered as open until the cumulated sales order value created withe reference to contarct is less than the Contract Value.

Once the value is reached, system stops you to create the sales order reference to the contract.

How can I do it.

I have created a contract VA41 ZWK1 with a value, then I have created a sales order ZWA, but I have not the line of scheduling in the sales order!

Anybody could tell me how can I do?

Thxxxx a lot

Kari

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Nov 12, 2012 at 10:51 PM

    dear,

    you need to run t-code VTAA and check out the copying control parameters for your sales doc types

    ZWK1 -> ZWA

    i recommend you to delete your record and create it again by copying from exisitng record WK1->OR

    after that create a new contract + order and test it

    regards,

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.