Skip to Content
0
Former Member
Nov 12, 2012 at 06:49 AM

Loading master data through Cons Monitor inProduction

30 Views

I have created some "Load from data Stream" methods to load master data mainly for some sub-assignments. This is done before transaction data from the source is loaded to ensure all transaction data with the relevant master data can be loaded.

I am trying to create a task on the consolidation monitor so that I can execute these LFDS methods in production before I load transaction data.

Can this be done and if so how?

Thanks, Alvin