Skip to Content
author's profile photo Former Member
Former Member

hi is it mandatory to create site in both system r3 and crm for initial load? if yes how to create sites?

Hi im new to sap crm so plz give me the clear idea on this

Thanks&regards

siva r

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Nov 10, 2012 at 05:35 PM

    Hi Siva,

    Brief steps on what has to be done in both the systems.

    In CRM System:

    Create RFC Destination pointing to R/3 ( Tcode: SM59 ).

    Using this RFC Destination create a Site of type R/3 ( Tcode: SMOEAC ).

    Then activate R/3 OLTP as a consumer in table CRMCONSUM

    In R/3 system:

    Create RFC Destination pointing to CRM ( Tcode: SM59 ).

    Activate CRM as consumer in table CRMCONSUM

    Then maintain CRMRFCPAR Table.

    Link for how to create site: http://help.sap.com/saphelp_nw70ehp1/helpdata/en/76/04b3f1439745b2aef5b97d58f4ac74/content.htm

    Regards

    Vinod

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.