Hi All,
In Repetitive Mfg. scenario Product cost collector for a particular material has status as TECO CNF GMPS PDLV PRC SETC VCAL, due to which user is unable to book production through MFBF. i have same queries regarding the same-
1. How TECO is being done for Product cost collector
2. How to find out who has done TECO for the same
3. how can I reverse the TECO status to release status.
waiting for response
Thanks in Advance,
MR