Function or bapi to read actual costs

Hi Gurus,

i created a report that read via BAPI BAPI_COSTACTPLN_READPRIMCOST Planned cost in input version and copy to destination version.

Now i've to enanch this report to read ACTUAL costs and still copy to planned version.

There is any bapi or function to do this? I would like to keep the structure of my report like the actual one, changed the less possible and avoiding reading COSS/COSP table directly.

BR

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Nov 09, 2012 at 12:08 PM

    Hi,

    Try with BAPI_COSTACTPLN_POSTPRIMCOST.

    Thanks,

    Anubhav

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.