Dear Guru's,
In below inspection lot,
X -> original one that created in process order, that time the inspection type was wrong
Y-> set the inspection lot X as cancelled and manual creation the inspection lot :Y after the material master QM view corrected
Z-> when the process order GR, system generated the new inspection lot
Now we want to know why the system generate the new inspection lot Z? In the normal, the system should use the manual creation one (Y),
Kindly help me to understand the system behaviuor better,
Many thanks in advance.
Regards,
Mohan kumar