Dear Experts,
My clients want to absord actual activity price so it can be allocated to the product respectively during Material Ledger closing.
In order to realise this, we have done cost allocation via assessment cycle, cost centre splitting (KSS2) and eventually calculate the actual price determination calculation (KSII). When KSBT is executed, we notice that the system have created the actual activity price for the month with price indicator (5).
The plan activity rate is entered manually as fixed price with price indicator (1) instead of calculating via KSPI.
After calculation the plan price is 900.00 and the actual activtiy price is 1500.00
When we perform the Material Ledger closing, I don't see system revalue the activtiy rate based on actual rate and absorb it to receiving materials. From what I've read and understood, if we don't execute MFN1 / CON2, Material Ledger will revaluate based on actual price and allocate to the receiving materials.
I've configured version 0 (plan/actual), price calculation tab as below:-
Plan
Method > Periodic Price
Actual
Method > Periodic Price
Revaluation > Own business transaction
I also don't see any value via transaction code CKMACD
Regards,
Siva