Skip to Content

Generation PR from PS

Hi I am assigning a material (parent material) with 3 child components in NWA. I have created a WBS BOM for this parent material. When I explode this in CJ20N the item category of the parent item is changed to Text. and while converting to a PR (collective PR) apart from the 3 line items for the 3 child components a seperate line item as Text material for the parent items is also created.

This I dont want. I only want the three line items in PR for the 3 child components. How is this possible?

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Nov 09, 2012 at 06:29 AM

    Hi all I could stop this. This was coming as Activity was with controlling key PS02.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Nov 09, 2012 at 06:43 AM

    But one more question the first child component has Item category L. And has procurement type F external with No Planning ND in MRP Type in material master. Ideally this should trigger PR while this is not happenning so.

    I checked MMBE and there is only Sales order stock. Why is this item not generating a PR? but generating a reservation.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.