Hi Experts
I am doing EHP1 Upgrade with NW 7.3 for Java ( BI abap and BI java with Portal ), generated the stack file and downldoaded the stack and copied to EPS/in , started the SUM , using SUM version released today i.e. 8th Nov 2012, now SUM is asking DVD mount point as below,
Enter mount points for the DVDs required for the procedure.
Enter at least the mount point containing Kernel DVD
The requested data carrier is not mounted on any of the mount points
you entered.
I have downloaded the stack and I do not have DVD to mount , again I try to put \usr\sap\trans\EPS\in , it does not take.
FYI , BI ABAP is one instance and java ( BI Java and portal ) is another instance and I got two stack files.
Please help