Hi,
On weekend, we have DB13 entry to do 'online reorg of recommended indexes'. However, it has been causing some issue lately - job get either 00C900BA or
00C90083.
Is there a way of avoiding this happening?
Is it possible to say, online reorg window to be within 10:00 to 13:00 - and the job to cancel after? That way we can 'avoid' scheduling the load job during that
'reorg window'? -
- is this possible to implement, and how? Any logic, tool available for this - i.e. job cancelled at 13:00. And if so, what is the impact/side-effect?
Thanks,
Terry