hi,
1
in oktz, the cost component of overhead is for product costing.
may i know in kzs2 costing sheet, is there a costing sheet for actual or standard? i check through all the costing sheet but do not know if there is costing sheet meant for actual or costing run/product costing.
2
may i know where KGI2 getting the actual overhead and where configuration of actual overhead i can see.
thanks