Hello everyone;
I'm sending IDOCs from SAP systems to SAP-MII systems.
I dont get stuck in SM58 with any error. However, when I was testing the "Delivery(DESADV)" IDOC, I have created two DESADV change IDOCs simultaneously (8 seconds between them):
SENDING IDOCS: (Checked in WE05)
Idoc Number Time 001 08:05:13 002 08:05:21When I checked my SAP-MII systems, I got the second IDOC(002) first and the first IDOC(001) later.
RECEIVED IDOCS: (Checked in MII system)
Idoc Number Time 002 08:10:38 001 08:10:55This should not happen if you know a delivery sequence should not be changed.
I'm suspicious about the SM58 that it might change the IDOC sequence and send it in different order. However there is no proof that I could find to prove it. Can this possible? Does SM58 change the IDOC sequence that I send?
Thank you
Talha