Skip to Content
0
Former Member
Nov 07, 2012 at 01:59 PM

Can SM58 Queue be different than the IDOC sending sequence?

214 Views

Hello everyone;

I'm sending IDOCs from SAP systems to SAP-MII systems.

I dont get stuck in SM58 with any error. However, when I was testing the "Delivery(DESADV)" IDOC, I have created two DESADV change IDOCs simultaneously (8 seconds between them):

SENDING IDOCS: (Checked in WE05)

Idoc Number Time 001 08:05:13 002 08:05:21

When I checked my SAP-MII systems, I got the second IDOC(002) first and the first IDOC(001) later.

RECEIVED IDOCS: (Checked in MII system)

Idoc Number Time 002 08:10:38 001 08:10:55

This should not happen if you know a delivery sequence should not be changed.

I'm suspicious about the SM58 that it might change the IDOC sequence and send it in different order. However there is no proof that I could find to prove it. Can this possible? Does SM58 change the IDOC sequence that I send?

Thank you

Talha