Hi,
I am using min and maximum lot sizing procedure with minimum lot size of 5 and max lot size of 5 so when i raise a requirement of fg it is creating two planned order of 5 and 5 and third planned order 3 but i need third planned order to be 5 qty. i am using ex lot sizing procedure and mrp type pd. But i need third planned order also to be planned 5 how can i get this
Regards
Badari