Multiple PR for a single item with multiple entries in BOM

31 Views

Dear Experts,

We have a scenario wherein a material is maintained 3-4 times in a BOM with UoM as KG.

The materials are maintained as multiple items as they are available with different shapes (e.g. triangular, circular, rectangular etc.)

The lot size for all materials will be EX always. The problem is that after MRP run for header material Single PR is generated for this material.

Users want to generate a separate PR for each item as per component weight.

As SAP don’t consider the shape of material and users are also unable to provide the conversion factor for PC to KG, can anyone please suggest how can we do this in SAP?

Best Regards,

Sujeet Garud