Hi,
For Performing production of one material Consider there are three operations and bom has two components x and y. x requires -2 qty and y requires 4. X is allocated to operation one of 2 qty but out of 4, 2 required for 2nd operation and another 2 required for 3rd operation how can i map this .Means 2 should backflush when i confirm the second operation and another 2 should backflush while confirming third operation.
Regards
Badari