Skip to Content
0
Former Member
Nov 01, 2012 at 11:19 PM

Upgrade Managment Tool Stages

21 Views

Hi,

I am performing a upgrade with the UMT from 3.1 to 4.0. I was wondering if anyone knows at what point can the 3.1 system be brought back online. According to the documentation, the 1st step of the UMT is to copy everything to the 4.0 system and then upgrade it. Can the 3.1 system be brought back up after this "Prepared" step is completed?

Wanted to know if anyone had tested this or confirmed this with SAP.

Thanks,

Dave