Nov 01, 2012 at 05:20 AM

Usage Decision resulting in stock without project assignment

43 Views

Hi guys.

After giving Usage Decision for a Production Order(WBS assignment), the stock comes in the desired storage location.

But it is not assigned to any WBS.

Which parameter of Material Master gives the Project link to the material ?

Thank you in advance.