Skip to Content
1
Former Member
Oct 31, 2012 at 10:53 AM

SLoc exclusion for MRP run in Mass?

363 Views

Dear All,

For MRP Run, my client want to exclude all storage locations except 1 which is "Main" storage location for all materials in plant.

I know that by T code MMSC we can do this for individual material code. As the number of materials are huge hence I have thought to do it by going on path production --> MRP --> planning --> Define storage location MRP per plant. Here I have selected plant and then MRP Ind. as "1" for all storage locations except "Main".

Now after this, I have created demand in MD61 then run MRP for SF material which has a 6 components (1 is SF & 5 are Raw).

But after MRP run I don't get the result (configuration done for storage location exclusion in mass). when i have checked the component materials then for Raw materials in MMSC for 2/3 storage locations MRP Ind. "2"(i.e. planned separately) is maintained and the configuration for mass is not activated for individual material in MMSC for anysingle material.

If I have go to T code MMSC and individually do exclusion for storage locations and then check the MRP run result then it works.

My question is, How can I do exclusion for all storage locations except "Main" in Mass for all materials which will trigger when i will check even for individual material in T code MMSC? OR How can do this configuration in Mass so that it will give me exact result?

Thanks,

Naresh