Lot Sizing Issue in Planning strategy 52

174 Views

Hi All,

I wanted to use planning strategy 52 at my FG level but as per SAP documentation system do not consider the lot sizing (min & max lot size) while doing the MRP run. Is there any way by which we can force the system to consider the lot sizing data and create the planned order accordingly.