Dear all,

In the standard SAP, scraps are considered for consumptions of materials at different level (opetation).

Ex.

Component A is consumed at operation 10

Component B is consumed at operation 20

If we start with 100 pces of a material and 15 pces are scraped at operation 10, (100 pces of component A are consumed).

When we confirm operation 20, system proposes automatically 85 pces for consumption of component B.

But in MD04, there are still 100 pces reserved for component B. (after scraping of 15 pces in operation 10)

Is there any possibility to change the reservation accordingly?