Dear Gurus,
My client has a requirement to control the quality lot size or quantity.
If the confirmation qty is 10 and I have activated 04 type in Material Master QM view, then the inspection lot which is generated takes the qty 10 automatically but as per the requirement it should be 2% or 4% of the confirmation qty or the order qty. Can any guru pls help me about how to control this?
Regards,
Saurav.