Skip to Content
0
Former Member
Oct 28, 2012 at 03:28 PM

How to control the lot size of a quality lot (in-process or Final Inspection during GR)

417 Views

Dear Gurus,

My client has a requirement to control the quality lot size or quantity.

If the confirmation qty is 10 and I have activated 04 type in Material Master QM view, then the inspection lot which is generated takes the qty 10 automatically but as per the requirement it should be 2% or 4% of the confirmation qty or the order qty. Can any guru pls help me about how to control this?

Regards,

Saurav.