hi,
hope can get kind advice from forum.
2 scenario. to have provision of freight cost during PO time, i need to have freight condition. 1 scenario is the freight is included in the material and another scenario is the freight need to separately pay to freight forwarder.
1 if freight is included in the material, in this case, i do not need to have freight condition. correct?
2 if freight is not included in material but i need to separately pay, then i need to have freight condition in PO. correct?
thanks