For example, a Material "1234" is created with Split Valuation, NEW, DEF, REF..
When we create a Maintenance Order, IW31, we assign this Material "1234" in the Component Tab of the Order. When we assign this component, we need the Valuation type "NEW" to be defaulted in the BATCH field.
Is this Valuation type "NEW" can be defaulted for the Material "1234" in the BATCH field of the Maintenance Order in the Component Tab.
Kindly suggest,
Raja