We are using AFS material and in planning board (CM25), I want to see below things in layout.

1. Grid information in layout - I brought grid value in layout key through CY38. When i execute plan board system is not displaying grid information. Is i am missing any thing?

2. Sales order delivery date.

3. Is it possible to add new field which is not available in structure.

let me know if anyone came across this problem.

Regards / US

Grid value.JPG (12.8 kB)
Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Nov 07, 2012 at 08:20 PM

    Hello,

    Planning board have not been enhanced for AFS. This is valid till the last AFS version 6.6.

    Production orders/planned orders have been enhanced for AFS to get schedule lines, however planning board only works at item level (standard behaviou). Hence, you won't get in standard grid values.

    You can however implement a user exit (goto spro, under capacity planning to the right customer exit, otherwise I could communicate it) to display AFS data such as category and season (those data are at order header level).

    You could alternatively set the "single grid value" in the AFS MRP to get one planned order created for each sku and implement the user exit to get grid value from stock table j_3abssi. From a manufacturing point of view, doing this would lead to other issues, I mean many documents to process, operation steps (like cutting for instance) which would not be optimized (even with combined order).

    In terms of capacity levelling (this is a personal opinion), I don't see a benefit of getting the grid value, it's much more faster to do it at higher level (material level). But getting category (depending on the usage), or production priority is usefull since it's a potential criteria for sequencing documents.

    Hope this will help.

    Regards,

    Mehdi

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Oct 26, 2012 at 08:37 AM

    Hi

    Please, see SAP Note 107590 - Disply MARA txts i.graphcal objct in planning broad.

    Check also this post: http://scn.sap.com/thread/2031994

    I hope this helps you

    Regards

    Eduardo

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.