Hi,

We have the typical scenario for production in other plant than the selling plant. We are using Stock transfer orders for the produced materials. For that purpose in MRP2 the respective materials are set up with special procurement key 40 and the necessary plant settings are done.

When MRP is run by t-code MD02 (after the sales document is created) everything is OK - there is the purchase requisition in planning plant and the planned order for production in the supplying (production) plant. It is different when MRP is run by MD03 - no planned order is created in supplying plant, and planning should be run separately at supplying plant level for the same material. What kind of configuration I am missing, so that a planned order in supplying plant to be generated automatically by the time the MRP is run at planning plant level?