Hi Gurus,

We have four raw materials which were handled with V-pricing. however, after the start of the september, I changed their pricing to S pricing. now, when i try to perform single level pricing/closing entries, system gives error c+805 (perform closing entry in previous period). current period is 10 and previous is 9. I thought the possibility of "maybe i close these materials for period 8", even the materials have pricing control V at that period, I tried must_settle and must_close however it gave the same error code.

This is the first time that i changed pricing from V to S and i could not forecast these consequences.

have any ideas?