Hi SRM Experts,
Need your Urgent support/advise on a PO Transmission error issue... Transfer from SRM 7.0 to Back End R/3 system
Pl. find below the details..
The PO 9XXXXXXXX has the status Error in Process...
I tried to manually push PO from SRM 7.0 to Back End R/3, The following error message was encountered in RZ20 log..
PO 9XXXXXXX EXCEPTION CONDITON "FAILURE " RAISED
PO 9XXXXXXX Transfer Failed Resubmit...
I checked some earlier posts on this related issue & found that one of the causes could be Account assignment data Not in Sync b/w SRM & Back End R/3.
Accordingly, when I checked the PO in SRM 7 & R/3 Back End, I found that item 2 ( the PO 9XXXXX has 3 items in SRM & only 2 in R/3 Back end) has been deleted in SRM 7 ..but not replicated to back end R/3..
So R/3 was rejecting further replication from SRM 7..,... I did the following:-
1.Via Change PO option, I Undelete item 2 & order/transfet..still material group error R/3 rejects the material group on item 2 as user had set product type to 02(services) instead of 01(materials) which is Not per CLient design..
2.Tried to delete item 2 ,Accnt assignment data in the portal & r eorder , still sytstem does not accept change, error in process continues
3.Tried to duplicate item 2 into a new line, still error in process
Pl can any one advise what I am missing?
Additonal Data:-
CLient on SRM 7.0 with ECS & back End R/3 with ECC 6.0
BR//Ranganath