Former Member
Sep 28, 2012 at 05:04 AM

Subcontracting PO Based on RM / BOM Stock Availability

53 Views

Dear SAP Gurus,

We are new to SAP, and we are in the process of implementing SAP ECC 6.0 in our organisation.

We are facing one problem in Subcontracting PO creation.

After MRP run, for subcontracting items planned order was generating based on the Pld Order we can able to convert to PR.

From PR to PO conversion or Plnd Order to PR conversion we need one check point, Whether the RM or the BOM qty available only the Subcontracting PR or PO need to generate.

For Example

Material number : 7000018 - 25 Nos required for SFG.

Material number : 7000018 is subcontracting material

For Material number : 7000018 is BOM Raw material : Ms Rod 63 Dia : 2500 mm

Here we need, IF 7000018 is required 25 nos but Ms Rod 63 Dia : 2500 mm ( bom ) is available means PR / PO need to generate, If Ms Rod 63 Dia : 2500 mm is not available PR / PO unable to generate. If Ms Rod 63 Dia : 2000 mm is available means PR / PO need to generate for 20 nos.

Hope everybody can understand the above scenario.

Request all of yours help.

Regards

S SASIKUMAR