We've a v linear manufacturing process. 2 operations for mixing, one for drying & last for the furnace. Is there a way in PP (like the collective orders) which can do the same thing as Collective Orders (auto GR & GI) across the multiple levels of the BOM. We would like to create one Order at the Finished level (Furnace) & to avoid having to manually create Orders & going through the GR/GI/UD process at each level. Is it possible??

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

3 Answers

avatar image
Former Member Jan 03, 2017 at 09:55 PM
0

Hello Andy

If you do not require manage semifinished products, you can model your process in one BOM level and one task list with 4 operations/phases.

Best Regards.

Milton

Share
10 |10000 characters needed characters left characters exceeded
Mate Lisztes Jan 04, 2017 at 11:33 AM
0

Hi Andy,

You may continue using the multi-level BOM, on the top level enter the components which have BOMs as phantom assemblies.
Create a routing with the 4 operations, where the last operation "furnace" is a milestone operation with all components allocated to it.

Then for the auto GR/GI by the time of the confirmation you will need 2 things:
1. Activate backflush on MRP2 view of the components (261)
2. A control key with auto GR (for example PP03) in the milestone operation. (for 101)

This way you will only need to create a single production order which will contain all components and all 4 steps of the production process.

Regards,
Mate Lisztes

Share
10 |10000 characters needed characters left characters exceeded
avatar image
Former Member Jan 04, 2017 at 12:42 PM
0

Hello Mate,

1. I will need to inventorize the output product of the intermediate 3 operations (2 mixing, 1 Drying), i.e. will need to post 101 movements for them. So, creating ONE multi-level BOM will not serve my purpose, unless there is a way to receive the intermediate products into inventory

2. The milestone operation function will only help me with doing the 101 for the product at the Furnace.

What I would like to achieve is more like the WIP batch concept, where I could show 101 at Operation confirmation for Mixing & drying before receiving the final product into inventory at the Furnace level. WIP batch also has a limitation though.